Orbita Engineering Executive Management During carrier works mainly coordinated projects,
A – İNFRASTRUCTURE AREA WORKS
- Consultant / controlling projects (09.2016 –12.2017)
MATLI Holding Central Office Tower ( Consulting – Controller ) - Bursa / TURKEY
MATLI Holding Burdur Factory ( Application Project - Controller)– Burdur / TURKEY
Coordinated (commercial building, carpark) High voltage systems (transformer , HV panels), Sub Energy Systems (generators), Low Current systems (Fire Alarm System, Voice Evacuation System, Emergency Signaling System), Low Voltage Systems (Power distribution panels, Emergency power distribution boards, Emergency Lighting System) and Converge Network System design, purchasing and implementation control.
- Askabad projects / TURKMENISTAN (06.2015 –08.206)
Building of the Ministry of Meteorology
Ministry of Tourism building
480 apartment 16-storey residential building
65 pieces 3-storey villa
2 pcs 600 students nursery
NOWAYY Shopping Mall (18000 m2)
2 pcs 4-storey carpark
UNDP Aşgabad center building
Coordinateted projects (about 30 projects include, residence, school, commercial building, carpark, civilization park, roads and Avm) High voltage systems (transformer , HV panels), Sub Energy Systems (generators), Low Current systems (Fire Alarm System, Voice Evacuation System, Emergency Signaling System) and Low Voltage Systems (Emergency power distribution boards, Emergency Lighting System) design, purcasing and implementation.
- Timsah Arena Stadium-(12.2014 –02.2015)-Bursa / TURKEY
Coordinated MV system (Several KVA, totaly 10.2 MVA transformer) , Sub energy systems (generators) LV distribution boards, LV systems installation, fire detection and voice evacuation system, BMS system, LED creens.LC systems ( IPTV, IP CTV, IP Phone), Data systems (back bone, active- passive equipment), design and implementation.
- Sheraton Bursa& Aloft Bursa Hotel - Bursa - (05.2011 – 04.2013)
Coordinated MV systems (2x1600 KVA dry type transformer), Sub energy system (2x1160 KVA generator ) , LV distribution and sub-distribution board systems, Fire detection and voice evacuation system, Building automation systems, LC system (IPTV- IP CCTV , IP telephone ), Data system ( backbone, server etc.), Busbar system design manufacturing and assembly. Electrical systems and equipment installation (lighting,sockets etc.) Testing and commissioning
- Sirte Al Tahaddy Uni. - (04.2010 – 05.2011) - Sirte / Libya
Coordinated ( 8 faculty, 1 sport complex, 5 service buildings – 312.000 m2 ) MV systems (14x2500 KVA dry type transformer+ 4x1600 oil type transformer), Sub energy system (2x1160 KVA generator ) , LV distribution and sub-distribution board systems, Fire detection and voice evacuation system, Building automation systems, LC system ( IP CCTV , IP telephone ), Data system ( backbone, server etc.), Busbar system design manufacturing and assembly. Electrical systems and equipment installation (lighting, sockets etc.)
- Al Tadamon Twin Towers - (05.2009 – 03.2010) - Tripoli / Libya
Coordinated ( 2 towers, 1 of 26 floor, 1 of 34 floor Office Tower ) MV systems (3x2500 KVA dry type transformer) design, Sub energy system (2500 KVA generator ), LV distribution and sub-distribution board systems design and installation, Fire detection and voice evacuation systems, Building automation systems, LC system ( IP CCTV , IP telephone ), Data system ( backbone ) , Busbar system installations design, manufacturing and installation. Electrical systems and equipment installation (lighting,sockets etc.)
B – INDUSTRIAL AREA WORKS
- OZLIDER PLASTICS and METAL CO. - (03.2006- 09.2006) - Istanbul
Coordinated ABS, PS, PP extrusion panel production, Injection – vacuum systems , Quality systems planning and applications, MRP working
- KOROZO AMBALAJ SAN. A. S. – (2002- 02.2006) -Istanbul
Coordinated Mounting of equipment and training of operator, Checking and maintenance of all sub systems ( HVAC, compressors, transformers, generators etc.), Annual maintanence budget preparation and planning, SAP maintanence applications, New factory project and data preparation, Electrical BoQ preparation and checking
- NAKSAN PLASTIK AMBALAJ SAN. A. S. -(08.1997- 08.2000) - Gaziantep
Coordinated Checking and maintenance of all sub systems ( HVAC, compressors, transformers, generators etc.), Annual maintanence budget preparation and planning, ERP maintanence applications, New factory project and data preparation, Electrical BoQ preparation and checking MV plant installation - energy centers in the synchronization Contribute to the creation of the ISO 9001 quality assurance procedures
Our Services
CONSTRUCTION & DECORATION
“BUILDING(B) /TOWER(T)”
- Project & design services (B/T),
- Supply of construction equipment’s & materials (B/T),
- Finishing & structural works (B/T),
- On turn-key basis construction (B/T),
- Renovation works (B/T),
- Decoration work,
- Curtain-wall,
- Aluminum frames,
- Conveying systems.
MECHANICAL
- Heating, cooling, ventilation systems,
- Fire protection systems,
- Compressed air installations,
- Sanitary installations,
- Water treatment units,
- Automatic control systems,
- Absorption chiller systems,
- Pool & irrigation systems,
- Building automation systems,
- Green building applications.
ELECTRICAL
- Medium Voltage switchgears.
- Medium Voltage Transformers
- Generator and UPS systems,
- Earthing systems, lightning protection systems,
- Lighting systems,
- Internal and external installations,
- Energy distribution panels.
- Data and telephone systems,
- CCTV systems,
- Security alarm systems,
- Fire alarm systems,
- Public address and voice alarm system,
- Projection systems,
- Access control systems,